Level 2 EV charger installation

Tesla Charger Installed to Code — Level 2 EV in St. Louis

Level 2 EV charger and Tesla Wall Connector installs by a licensed electrical contractor. Permits handled. We confirm the circuit and panel path first—then give a firm quote.

Licensed & insuredPermits handledSt. Louis / St. CharlesSince 2000Installed to code

What to plan for

Level 2 charging, done as electrical work

  • Tesla Wall Connector and other Level 2 EVSE installs, hardwired or as the manufacturer and code allow for the unit you choose
  • Dedicated circuit planning from panel to charger location
  • Panel capacity check—and an honest conversation if a panel or service upgrade is needed first
  • Permitting and inspection with the local AHJ
  • Neat mounting, labeling, and a walkthrough so you know how the circuit is protected

How we work

Video triage or site check, then a firm quote

  1. 1

    Call or form

    Share the address, vehicle or charger type—Tesla Wall Connector, other Level 2, or undecided—and a photo of the panel and proposed wall location if you have them.

  2. 2

    FaceTime / video triage

    For many EV installs we can start with a short video look at the panel and run path to speed the quote. Complex or older services still get an on-site check.

  3. 3

    Firm quote

    Clear electrical scope for the Level 2 install, with any panel work called out separately if required.

  4. 4

    Permits & install to code

    Licensed install through inspection.

EV charger install package = triage/site check → firm quote → permitted install to code.

Project scope

The charger is only as good as the circuit behind it

  • Many St. Louis-area homes can take a Level 2 charger on the existing service; some need a panel or service upgrade first.
  • We will not pretend a Wall Connector just plugs in if the panel cannot support it.
  • If upgrade work is needed, we explain it as its own scope.

If a panel or service upgrade is needed, we explain it as its own scope. See our panel upgrade page for the site-check approach. Panel upgrade site-check details.

St. Louis & St. Charles metro

Flare Communications is a family-owned licensed electrical contractor based in Ballwin. We are licensed for St. Louis City & County. We install Level 2 EV charging across the St. Louis and St. Charles metro; nearby Illinois locations are considered when the job fits.

Licensed & insured

Permits handled

Family-owned since 2000

Straightforward firm quotes

Job photos

Charger on the wall — example layout

Example install. Your quote follows a site or video check of your panel and run.

Request a site check

Request an EV charger site check

Ready to schedule? Call (636) 391-7530. Or send details—we’ll call you back today when we can.

Helps video triage and site prep. Images only, up to 6 MB.

Licensed electrical · St. Louis / St. Charles · Since 2000 · installs@flarecomm.com

Questions

Straight answers before the site check

Do you install Tesla Wall Connectors?

Yes—we install Level 2 EV chargers including Tesla Wall Connector units, wired to code with the right circuit and permitting.

Can you quote from a photo or FaceTime?

Often we can start with video triage of the panel and wall location. Final firm quotes still depend on what we confirm about capacity and the run—some homes need an on-site visit.

What if my panel is too small?

We’ll say so and quote panel or service upgrade work separately if needed. No surprise it’ll fit promises.

Do you publish charger install prices online?

No. Sites and panels differ. Site check or video triage, then a firm quote—no fake low prices.

Call (636) 391-7530